2017–2019

Poster text:
Dalton adds a two-story rooftop addition to the existing 12-story building and repurposes existing space.
This new facility includes a STEAM facility, a new library, a demonstration kitchen, art and dance studios.
Poster text:
Dalton adds a two-story rooftop addition to the existing 12-story building and repurposes existing space.
This new facility includes a STEAM facility, a new library, a demonstration kitchen, art and dance studios.